North Carolina Land Survey Drafting

Land Survey Drafting in North Carolina

Land survey drafting in North Carolina for Professional Land Surveyors and their firms. We prepare boundary, recombination, and G.S. 47-30 plat drawings from your field data and property research, with the coordinate notes and certificate you specify for your review.

Overview

What is Land Survey Drafting in North Carolina?

We draft North Carolina boundary and recombination plats, topographic maps, and easement exhibits from your field file and records. For recording, G.S. 47-30 sets the sheet format, title information, and surveyor-selected classification certificate. Tell us the county and submission type before drafting starts.

Your drawings include the supplied adjoiner references, monument descriptions, curve data, vicinity map, and bearing basis. Coordinate labels identify the datum and realization; grid plats show the combined factor. We prepare reviewable CAD and PDF sheets and incorporate your corrections before final release.

Our survey CAD drafting for licensed land surveyors covers recombinations and ALTA/NSPS land title survey plats. Arcengine holds no NCBELS surveying license. The PLS makes surveying decisions and controls preparation throughout. Confirm outside-firm eligibility under the employee-or-assistant provision with NCBELS or counsel before sending work.

At a glance

  • State planeNAD 83 zone 3200, one statewide zone
  • Plat sheets18 × 24, 21 × 30, or 24 × 36 in., by county
  • Plat rulesG.S. 47-30; 21 NCAC 56 .1600
  • RegulatorNCBELS (PLS license, firm license)
  • DeliveryUnsealed DWG and PDF, ready to plot on mylar (G.S. 47-30(b))
  • Your roleYou supervise the drafting, then sign and seal the G.S. 47-30 certificate

What we deliver

What's included in North Carolina Survey Drafting

Tell us whether the map will be recorded, the survey class, and the certificate category you assign. Send field data, deed research, and the county checklist so we can set up the right sheet and certificate blocks.

G.S. 47-30 Recordable Plats

Recording sheets in an accepted 18 × 24, 21 × 30, or 24 × 36 inch size, with the binding border and required information placed prominently in the plat title.

Boundary Survey Drafting

Boundary plats with supplied adjoiner ownership or legal references, found-or-set monuments, and sources for unsurveyed lines. Tax PINs supplement the supporting deed or plat references.

ALTA/NSPS Survey Drafting

ALTA/NSPS land title survey plats with contracted Table A items and North Carolina map requirements, including the certificate appropriate to recording status.

Topographic Survey Drafting

Topographic maps with supplied control points, coordinates, units, and datum. Areas you identify as obscured carry the required contour-reliance note.

Subdivision & Recombination Plats

Subdivision plats and recombinations with dimensions, perimeter closure, your classification certificate, and local approval and Review Officer blocks.

GPS Certificates & Control Notes

GNSS notes or certificates populated from your field metadata, including accuracy, procedure, dates, control, datum and epoch, geoid, combined factor, and units.

Multi-Sheet Map Sets

Multi-sheet map sets with matchlines, a certificate on one sheet, and signature and seal blocks on the remaining sheets.

Easement Exhibits & Deed Maps

Easement exhibits and deed-attachment maps up to 8 1/2 × 14 inches, with the certification or illustrative-map disclaimer you specify under G.S. 47-30.

Utility, Pipeline, As-Built, Aerial & LiDAR Sheets

Pipeline, utility, as-built, aerial, and LiDAR sheets in the datum and foot definition you supply, kept consistent with the related plat.

Why it matters

What G.S. 47-30 and the Board's rules require on a plat

G.S. 47-30 sets recorded-plat requirements. The Board’s Standards of Practice for Land Surveying also govern unrecorded work. You assign the survey class and provide the precision or positional-accuracy statement; we place those notes and the appropriate preliminary label on check prints.

Recording can require both local approval and a county Review Officer’s certificate. Supply the classification certificate and current local checklist. We leave the necessary approval space and revise the drawing to your reviewer comments. The PLS certifies the survey content; the county decides recordability.

NAD 83 uses the single North Carolina State Plane zone 3200. State the frame, realization, and units for each coordinate file.

Supply the control ties and corner coordinates required for the job. G.S. 47-30 addresses published control within 2,000 feet and permitted alternatives when it is unavailable.

The north arrow states the bearing basis. Grid references include datum and realization, with the combined grid factor shown.

Keep the coordinate-system foot definition explicit. North Carolina distinguishes U.S. survey feet for legacy NAD 83 and NAD 27 work from international feet for NATRF2022.

Provide adjoiner ownership or legal recording references from your research. A tax PIN alone does not replace the deed or plat evidence.

The PLS retains direct control and personal supervision during preparation. Editable files leaving that control omit the computer-generated seal unless digitally signed as the rules permit.

Where it applies

Industries We Serve

Surveying Firms

CAD support for North Carolina PLS firms, with your title block and firm identification on the drawing set.

Land Development

Subdivision, recombination, and exempt-division plats for the project’s PLS, using your selected certificate category.

Title & Real Estate

Boundary and ALTA/NSPS sheets for surveyors supporting sales and lending, with supplied adjoiner references.

Engineering & Site Design

Topographic base maps for the PLS supporting site design, including control, datum, and obscured-area notes.

Utilities

Public utility easement exhibits and utility mapping for surveyors supporting utility projects.

Municipal Work

Review and recording sets for the surveyor, with local approval and Review Officer certificate space.

How it works

Our End-to-End Process

Scope & Standards

You tell us the drawing type, survey class, plat certificate category, datum and realization, units, and the county where the plat will be recorded.

Data Transfer

Send field data, coordinate files, deeds and recorded plats, your sketches, and your CAD template and title block.

Drafting

We draft linework, annotation, curve data, tie lines, and notes in AutoCAD, Civil 3D, or MicroStation.

Quality Check

We check closure, labels, and notes against your data and the plat items you list, then send PDF check prints marked preliminary for your redlines.

Approval & Delivery

We revise until you approve, then deliver unsealed AutoCAD DWG and PDF files. You sign, seal, date, and release the plat.

Why Arcengine

Why Choose Us

Fixed Price, No Hidden Costs

We agree the price before drafting starts.

Clean, Checked Drawings

Linework and labels checked against your field data.

Experienced Survey Drafters

Our team drafts for surveying firms in the U.S. and abroad.

Deadlines Kept

We agree the deadline with you before work starts.

Open to Feedback

Send redlines and we revise the drawing to your instructions.

Your Software & Templates

AutoCAD, Civil 3D, or MicroStation, using your title block and layers.

Start with a Pilot Project

Use a pilot project to check our drafting against your standards.

You Keep Responsible Charge

We draft to your instructions. You direct and review the work, approve the final drawing, and seal it. We never apply a seal or claim a license.

Explore more

Our Other Services

FAQ

Frequently Asked Questions

No. Arcengine is a CAD drafting company and holds neither an NCBELS land surveying license nor a surveying firm license. We do not survey, make professional surveying decisions, or apply seals. The PLS directs preparation and signs and seals the final. We cannot promise approval or recording; property owners should hire and verify a North Carolina PLS.

Project assurance

How your project is handled.

We work from your field data, templates and instructions. You direct, review and approve the drawings.

How we protect project information
In-house delivery
An Arcengine drafting team handles your work.
NDA protection
Project information handled under an NDA.
E&O insured
Professional liability insurance in place.
CAD standards checked
Drawings checked against your templates and markups.

Get in touch

Land survey drafting in North Carolina, ready for your seal

Send field data, deeds, your survey class, datum, and county checklist. We return CAD and PDF sheets for your direction and review before you sign, seal, and release them.