California Land Survey Drafting

Land Survey Drafting in California

Land survey drafting in California for Professional Land Surveyors and civil engineers licensed before 1982. We turn your field data and records into records of survey, corner records, parcel maps, and final maps under your direction, for your review and seal.

Overview

What is Land Survey Drafting in California?

We draft California survey maps from your field data, deeds, record maps, and preliminary title report. Your instructions establish the map's content and format; we prepare the CAD sheets, exhibits, and check prints for your review.

California records can use the Humboldt, Mount Diablo, or San Bernardino meridian, or a rancho reference. We retain the land-record references you identify and set up each record of survey, corner record, parcel map, or final map for its required format.

Our land survey drafting services support the licensee in responsible charge, including lot line adjustment exhibits and ALTA/NSPS land title survey plats. You direct preparation, decide every surveying issue, and sign and seal the map. Confirm the outside-drafting arrangement's statutory and business requirements with BPELSG or your counsel before work starts.

At a glance

  • State planeCCS83 Zones 1 to 6; CCS27 Zone 7 (Los Angeles County) became part of Zone 5
  • UnitsCCS83: meters/U.S. survey feet; CCS2022: international feet (NGS beta)
  • Recorded map sheet18 × 26 in., 1 in. blank margin
  • RegulatorBPELSG (Professional Land Surveyor license)
  • DeliveryAutoCAD DWG and PDF; check prints marked "preliminary" (B&P 8761(c))
  • Your roleYou set map content and format (Board Rule 404.2), then sign and seal

What we deliver

What's included in California Survey Drafting

Send your source data, map type, CAD template, and county or city check sheet. We draft to your instructions and return sheets for review.

Record of Survey Drafting

Records of survey on 18 × 26 inch sheets, with your monument calls, bearings, distances, filing reason, and the Act's authorized surveyor, county, and recorder statements.

Corner Record Drafting

Corner records on the Board's 8.5 × 11 inch form, with the section or rancho references and recovery sketch from your notes.

Tentative & Final Map Drafting

Tentative and final tract maps with your lot layout, line and curve data, monument ties, and agency-required statements.

Parcel Map Drafting

Parcel maps with numbered or lettered parcels, a distinctive exterior boundary, designated remainders, and your applicable monument statement.

ALTA/NSPS Survey Drafting

ALTA/NSPS plats to the 2026 standards and contracted Table A items, with title exceptions plotted or noted as you direct. We can also draft a required record of survey.

Lot Line Adjustment Plats

Lot line adjustment exhibits to accompany your descriptions and the local agency application. You determine whether a record of survey is also required.

Easement & Dedication Exhibits

Easement and right-of-way exhibits to accompany the descriptions you prepare, with your name and license number.

Topographic Survey Drafting

Topographic drawings from your field or LiDAR data, using the coordinates, grid factor, mapping angle, and representative-point elevation you supply.

Boundary, Utility, As-Built, Aerial & LiDAR Drawings

Boundary drawings with your found, set, reset, or replaced monument calls, plus utility, as-built, aerial, and LiDAR sheets in your zone, units, and layer standards.

Why it matters

Statutes and check sheets that shape a California map

The Professional Land Surveyors' Act, BPELSG rules, Subdivision Map Act, and coordinate statutes shape the drawing. Board Rule 404.2 leaves map content and format with the licensee in responsible charge. We follow your decisions and template.

Send the current county or city checklist. We check sheet size, statements, line and curve data, and supplied closure calculations against it, then revise the CAD sheets to your review comments.

Specify CCS83 Zones 1 to 6 or the legacy system in your records. CCS27's Los Angeles Zone 7 became part of CCS83 Zone 5; preserve the original system label with legacy values.

For CCS coordinates, supply the mapping angle, combined grid factor, representative-point elevation, and control scheme. We place them on the map or accompanying control sheet.

CCS83 values in feet use U.S. survey feet. California permits CCS2022 and defines its international foot, while NGS's modernized tools remain beta. You specify the actual system and units.

Tell us the record-of-survey filing date. The Act generally allows 90 days after monuments are set or fieldwork ends, whichever comes first, with provisions for delays beyond your control.

We keep boundary line weights and lettering legible at recording size, using the county's checklist and CEAC guidance.

Only a person authorized to practice land surveying may approve, sign, stamp, or seal the map. Your licensee supplies monument designations and completes the certification.

Where it applies

Industries We Serve

Surveying Firms

CAD capacity for California surveying firms preparing records of survey, corner records, and maps around their filing schedules.

Civil Engineering

Parcel maps, final maps, and easement exhibits for engineering firms' licensed surveyors or authorized pre-1982 civil engineers.

Land Development

Tentative and final tract maps for developers' surveyors, prepared to the local agency's checklist and review comments.

Title & Real Estate

ALTA/NSPS and boundary drawings for surveyors serving title and real estate clients, with title-report exceptions shown as directed.

Public Works & Utilities

Right-of-way and easement exhibits for surveyors serving public agencies and utilities.

Agriculture & Rural Land

Section and rancho parcel drawings for farm and ranch surveyors, using their record research and computations.

How it works

Our End-to-End Process

Scope & Standards

You tell us the map type, CCS zone, units, and the county or city check sheet that applies.

Data Transfer

Send field data, coordinate files, record maps, deeds, the preliminary title report, and your CAD template and title block.

Drafting

We draft linework, annotation, curve data, statements, and notes in AutoCAD, Civil 3D, or MicroStation.

Quality Check

We check the drawing for drafting errors in closures, labels, and notes against your data and the check sheet, then send PDF check prints for your review and redlines.

Approval & Delivery

We revise until you approve, then deliver the final AutoCAD DWG and PDF files. You sign, seal, and file the map.

Why Arcengine

Why Choose Us

Fixed Price, No Hidden Costs

We set the price before work starts and add no charges later.

Clean, Checked Drawings

Clear linework and legible labels, checked for drafting errors before you review them.

Experienced Survey Drafters

Our team has drafted for surveying firms in the U.S. and abroad.

Deadlines Kept

We agree on the deadline with you before work starts, and we meet it.

Open to Feedback

We take your redlines and rework the drawing until it matches what you need.

Your Software & Templates

We work in AutoCAD, Civil 3D, and MicroStation, on your title block and layer standards.

Start with a Pilot Project

Start with a pilot project to check our drafting against your standards.

You Keep Responsible Charge

You direct preparation and make the surveying decisions. We send progress sets and revise to your instructions before your final review and seal.

Explore more

Our Other Services

FAQ

Frequently Asked Questions

No. Arcengine is a CAD drafting company, holds no BPELSG license, and offers no land surveying. California's licensee in responsible charge must direct preparation, decide map content and format, and sign and seal the map. Final review alone does not establish that an outside firm's arrangement qualifies; confirm the subordinate and business requirements with BPELSG or counsel before work starts. Landowners should hire a California Professional Land Surveyor.

Project assurance

How your project is handled.

We work from your field data, templates and instructions. You direct, review and approve the drawings.

How we protect project information
In-house delivery
An Arcengine drafting team handles your work.
NDA protection
Project information handled under an NDA.
E&O insured
Professional liability insurance in place.
CAD standards checked
Drawings checked against your templates and markups.

Get in touch

Land survey drafting in California, ready for your seal

Send your map type, CCS zone and units, field data, records, preliminary title report, and local check sheet. We return DWG and PDF drawings for your review and seal.